Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›SHE Transmission Awards MMT with Cable Route Survey Contract (UK)
Offshore Wind

February 5, 2013 · about 13 years ago

SHE Transmission Awards MMT with Cable Route Survey Contract (UK)

Scottish Hydro Electric Transmission plc (SHE Transmission) has awarded MMT Sweden the HVDC cable re-route survey from Shetland to the Caithness landfall. SHE Transmission, which is part of the SSE Group, is planning to install a HVDC cable system between Shetland and Caithness, on the Scottish main

1 minutes read
  • LinkedIn
  • X
  • Email

Scottish Hydro Electric Transmission plc (SHE Transmission) has awarded MMT Sweden the HVDC cable re-route survey from Shetland to the Caithness landfall.

SHE Transmission, which is part of the SSE Group, is planning to install a HVDC cable system between Shetland and Caithness, on the Scottish mainland, to accommodate proposed renewable energy developments in Shetland.

In 2008 and 2010 MMT Sweden AB (former known as Marin Mätteknik AB) performed a geophysical, geotechnical and environmental survey of the previous design route for this cable system. The data presented large areas determined unsuitable for cable laying and a re-routing survey was therefore required.

Geophysical, geotechnical and environmental data will be collected along the new re-routing sections. MMT survey vessel Seabeam will perform the near shore survey at the Sinclairs Bay landfall and Franklin will be operated for the offshore areas. Together with the data collected during the previous survey campaigns a combined corridor between 1000m and 3500m in width along the length of the route will be presented.

The objective of the cable route survey is to determine water depth, sediment structure, identify seabed features and obstructions and to collect data for environmental and archaeological assessments.

The work will commence in Q1 2013.

[mappress]

Press release, February 5, 2013; Image: MMT

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindBusiness & FinanceResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Minesto reports 'record' 48-hour service intervention on its tidal power plant
  2. 2Rig provider and other contractors revealed for Timor-Leste's oil field
  3. 3Subsea7 contracts Worley for Northern Lights' key subsea structures
  4. 4Ofgem to launch record tender looking for owner of Hornsea 3 offshore transmission assets

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free