Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Noble Tamar Jacket Arrives at Tamar Gas Field Offshore Israel
Subsea

January 30, 2013 · about 13 years ago

Noble Tamar Jacket Arrives at Tamar Gas Field Offshore Israel

Tugs FAIRMOUNT SUMMIT and FAIRMOUNT ALPINE have delivered the new build Noble Tamar jacket at location in the Tamar gas field in the Eastern Mediterranean. Both tugs towed the barge on which the jacket was loaded from the US to the field South-East of Cyprus. The 18,500 ton jacket was build in the U

1 minutes read
  • LinkedIn
  • X
  • Email

Tugs FAIRMOUNT SUMMIT and FAIRMOUNT ALPINE have delivered the new build Noble Tamar jacket at location in the Tamar gas field in the Eastern Mediterranean. Both tugs towed the barge on which the jacket was loaded from the US to the field South-East of Cyprus.

The 18,500 ton jacket was build in the US. In Corpus Christi the jacket was loaded on the 260 meters long barge H-851, world’s largest launch and cargo barge owned by Heerema Marine Contractors.

Fairmount Marine, part of the Louis Dreyfus Armateurs Group, was contracted by Heerema Marine Contractors and mobilized the tugs FAIRMOUNT SUMMIT and FAIRMOUNT ALPINE to Corpus Christi. From this port the convoy set sail for the 9,000 miles voyage.

It took only 54 days at an average speed of 6.9 knots to deliver the barge in the Tamar field. Upon arrival the FAIRMOUNT SUMMIT and FAIRMOUNT ALPINE assisted in the launching and installation operations.

The Tamar gas field is classified as the largest deepwater natural gas discovery in 2009. Production is expected to start in the second quarter of this year.

After launching the Tamar jacket FAIRMOUNT ALPINE was released and went on to her next assignment. FAIRMOUNT SUMMIT continued with barge H-851 for a 5,150 miles voyage towards the Far East.

[mappress] Press Release, January 30, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free