Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Waterways Ireland: Winter Closures Introduced
Dredging

October 18, 2012 · about 14 years ago

Waterways Ireland: Winter Closures Introduced

Waterways Ireland has announced planned closures of the waterways for the winter of 2012-2013. GRAND CANAL – MAIN LINE – DUBLIN Portobello to Inchicore: Level C7 from Portobello to Inchicore will be closed for dredging from 8th October 2012 to 17th March 2013. Tullamore: The canal in Tullamore is sc

1 minutes read
  • LinkedIn
  • X
  • Email

Waterways Ireland has announced planned closures of the waterways for the winter of 2012-2013.

GRAND CANAL – MAIN LINE – DUBLIN

Portobello to Inchicore: Level C7 from Portobello to Inchicore will be closed for dredging from 8th October 2012 to 17th March 2013.

Tullamore: The canal in Tullamore is scheduled to be closed from 5th November 2012 to 4th March 2013 to facilitate the construction of three footbridges and a boardwalk by Tullamore Town Council.

GRAND CANAL – BARROW LINE

Rathangan: The canal may be closed in Rathangan for dredging from January 2013 – dates to be confirmed.

ROYAL CANAL

Spencer Dock, Newcomen Bridge: There will be no further lifts of the Newcomen railway bridge until the 2013 boating season.

Blackshade Bridge to Hill of Down: The Royal Canal is closed between Blackshade Bridge and Hill of Down from 1st October 2012 to 17th March 2013 to carry out urgent essential bank strengthening works.

Aghnaskea Bridge to Savage Bridge: The Royal Canal will be closed between Aghnaskea Bridge and Savage Bridge, Killashee, from 1st November 2012 to 20th January 2013 to carry out leakage repairs.

[mappress]

Press Release, October 18, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1€3.1 billion Spain-France interconnector is 70% complete
  2. 2Petrobras hits paydirt for third time in ultra-deep Amapá waters as Equatorial Margin’s oil arsenal grows
  3. 3SBM Offshore tasks Seatrium with multimillion-dollar South American FPSO job
  4. 4Fatal rig incident: Search still underway for two missing workers off Gabon

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free