Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Denmark: Illuminating Anholt Offshore Wind Farm
Offshore Wind

October 5, 2012 · about 14 years ago

Denmark: Illuminating Anholt Offshore Wind Farm

Before the wind turbine installation at Anholt wind farm was commenced, all activities in the wind farm were focusing on the seabed and the water surface, but with the erection of the first wind turbines, Anholt Offshore Wind Farm has suddenly started becoming a visible skyline – with a more precise

2 minutes read
  • LinkedIn
  • X
  • Email

Before the wind turbine installation at Anholt wind farm was commenced, all activities in the wind farm were focusing on the seabed and the water surface, but with the erection of the first wind turbines, Anholt Offshore Wind Farm has suddenly started becoming a visible skyline – with a more precise height of 141.6 metres.

That is the height from the water surface to the top of the upper blade tip in its highest position. It means that aviation lights are important, and the erection of the wind turbines is planned in a way, which provides the largest possible safety, especially for the air traffic.

All 111 wind turbines are equipped with two fixed, red low-intensive lights. Moreover, 14 wind turbines are equipped with white synchronously flashing mean-intensive lights. The 14 wind turbines are all corner wind turbines, and wind turbines placed along the edge of the wind farm, ie the interval between the lights, never exceeds five kilometres.

In case of wind turbines with red and white lights, the red light will be switched on only in case of possible future hoist operations to the wind turbine; in that case, the white light is switched off.

Both the low- and mean-intensive lights will be placed on the turbine nacelle on the front of both sides of the helihoist platform railing.

In connection with the installation of the wind turbines, it has been planned to first erect wind turbines with mean-intensive light. The remaining wind turbines will be installed either between or ‘fenced by’ the wind turbines with mean-intensive light for air safety reasons.

[mappress]

Press release, October 05, 2012; Image: dongenergy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Mazarine taking the helm at Black Sea Oil & Gas as Carlyle and EBRD exit
  2. 2CNOOC’s 2026 run powered by 9 start-ups, 5 new oil & gas discoveries, and 23 appraisals
  3. 3Solstad vessel nets two subsea contracts in Asia Pacific
  4. 4Noble rigs’ $560 million drilling gigs push fleet backlog to $6.7 billion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free