Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Papua New Guinea: Castoro 10 Completes PNG LNG Offshore Pipeline Installation
Fossil Energy

July 26, 2012 · about 14 years ago

Papua New Guinea: Castoro 10 Completes PNG LNG Offshore Pipeline Installation

Installation of the PNG LNG Project’s 407-kilometre offshore pipeline is complete, after the two sections of pipe were recently connected. This major milestone was performed by the Castoro 10 Shallow Water Lay Barge. The pipeline was laid in two sections over eight months, using two vessels, one sta

1 minutes read
  • LinkedIn
  • X
  • Email

Installation of the PNG LNG Project’s 407-kilometre offshore pipeline is complete, after the two sections of pipe were recently connected.

This major milestone was performed by the Castoro 10 Shallow Water Lay Barge.

The pipeline was laid in two sections over eight months, using two vessels, one starting at Caution Bay, while the other started at Omati in the Gulf Province.

The Castoro 10 connected the two sections of pipe in an activity known as an “above water tie-in”, by lifting each end of the two pipelines simultaneously using six small cranes. The pipeline ends were then cut off, joined, and welded to form one continuous pipeline.

Once the tie-in was completed, the now-joined, single pipeline was lowered back into the water.

The next step in the pipeline process will be the hydrotest of the pipeline, which will check the integrity of the pipeline.

This will be followed by connecting the offshore pipeline with the 292-kilometre onshore pipeline, an activity that is expected to be completed later this year.

[mappress] Press Release, July 26, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1JERA deepens Australian LNG foothold with larger stake in Chevron’s project
  2. 2MoU charts the path for tidal and ocean current energy projects in Chile
  3. 3Seadrill hit with $55 million bill after appeals court upholds rig breach ruling
  4. 4Sunda steps closer to dusting off 1985 gas field as New Zealand bid goes exclusive

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free