Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›VOSCF Installs GBS Offshore Sakhalin Island (Russia)
Subsea

July 5, 2012 · about 14 years ago

VOSCF Installs GBS Offshore Sakhalin Island (Russia)

This week VOSCF, a joint venture between Sovcomflot and Van Oord, successfully installed a Gravity Based Structure (GBS) for the offshore platform Berkut in the Arkutun Dagi field offshore Sakhalin Island. The GBS was designed and constructed by Kvaerner in the Russian mainland port of Vostochny in

1 minutes read
  • LinkedIn
  • X
  • Email

This week VOSCF, a joint venture between Sovcomflot and Van Oord, successfully installed a Gravity Based Structure (GBS) for the offshore platform Berkut in the Arkutun Dagi field offshore Sakhalin Island.

The GBS was designed and constructed by Kvaerner in the Russian mainland port of Vostochny in Nakhodka, for the Sakhalin 1 Project.

The GBS with overall dimensions of 135 X 100 wide and 55 m tall has an overall weight of 160,000 tons. The GBS is designed to withstand the large forces that are imposed by ice fields up to two meters thick, seismic activity of the region, winter temperatures which can drop to 44 degree below zero and seas up to 13 to 16 m. Berkut will be the largest offshore production platform in Russia.

GBS tow commenced on the 3rd of June along a route of 1,900 km to the Arkutun Dagi field approximately 25 km off the northeast coast of Sakhalin Island. Upon arrival at site, the GBS was accurately positioned above its final location and was lowered to the seabed in a water depth of 35 m on 25 June 2012. Under base grouting has also been completed. Installation of scour protection rock is in progress.

[mappress] Subsea World News Staff , July 05, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Equinor to feed Dutch grid with low-emission Norwegian gas through 2031
  2. 2BW Energy locks down multimillion-dollar financing for offshore platform and production growth
  3. 3Tidal energy array in Scotland cleared for construction start
  4. 4Murphy Oil notches dual exploration wins in West Africa and Asia alongside Vietnam and US Gulf start-ups

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free