Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›First Subsea Moors PSVM FPSO Offshore Angola
Fossil Energy

May 29, 2012 · about 14 years ago

First Subsea Moors PSVM FPSO Offshore Angola

Subsea mooring connector specialist, First Subsea, has successfully completed the mooring of the PSVM (Plutao, Saturno, Venus and Marte) FPSO in 2,000 meters (6,562 feet) of water, in the BP Block 31 ultra deepwater development, offshore Angola. The external turret-moored FPSO has 12 mooring lines,

1 minutes read
  • LinkedIn
  • X
  • Email

Subsea mooring connector specialist, First Subsea, has successfully completed the mooring of the PSVM (Plutao, Saturno, Venus and Marte) FPSO in 2,000 meters (6,562 feet) of water, in the BP Block 31 ultra deepwater development, offshore Angola.

The external turret-moored FPSO has 12 mooring lines, each with a Ballgrab Series I ball and taper subsea mooring connector, with a minimum breaking load (MBL) of 4,903kN. The female receptacle part of the Ballgrab connectors was installed subsea, mounted on docking porches on suction piles, ahead of the arrival of the PSVM FPSO. Once the production vessel was on-station, the mooring connector attached to the mooring line was lowered into the receptacle to complete the installation. The process was then repeated until all 12 mooring lines were connected.

Chris Newlands, mooring project manager, SOFEC Inc, commented: “The First Subsea team did a great job. The moorings went very smoothly; we were kept informed at every stage, ensuring each mooring was completed without a hitch.”

The double-hulled PSVM FPSO is a hub field development that will produce oil from the Plutao, Saturno, Venus and Marte fields. Comprising the northeast sector of the license about 400 kilometers (249 miles) from Luanda, PSVM is the first of four planned development projects on Block 31.

[mappress] Source: First Subsea, May 29, 2012; Image: Sembcorp

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceEquipment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Eni sheds partial stakes in Indonesian gas assets as Pertamina and Medco bolster portfolios
  2. 2New wind for hydrogen-electric shipping as GMI-PowerCell collaboration expands to four bulk carriers
  3. 3AI, next-gen tech, and maritime decarbonization on RINA- China Merchants Energy Shipping pact’s agenda
  4. 4Stena Drilling’s 18-year-old drillship is on its way to Namibia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free