Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Hydrex Provides On-Site Propeller Repair in Ghent (Belgium)
Subsea

May 4, 2012 · about 14 years ago

Hydrex Provides On-Site Propeller Repair in Ghent (Belgium)

When all four propeller blades of a 100-meter general cargo vessel were severely bent, a repair was required by the classification society. Hydrex therefore performed a detailed video inspection, followed by a repair while the vessel was berthed in Ghent, Belgium. To make a full assessment of the da

2 minutes read
  • LinkedIn
  • X
  • Email

When all four propeller blades of a 100-meter general cargo vessel were severely bent, a repair was required by the classification society. Hydrex therefore performed a detailed video inspection, followed by a repair while the vessel was berthed in Ghent, Belgium.

To make a full assessment of the damage, the diver/technician team first performed a detailed underwater inspection of the blades. This revealed that one blade was bent over an angle of 15° while the other three were bent over an angle of 90°. Because the damage was too extensive, straightening these last three blades was not an option. To keep the balance of the propeller, it was decided to crop all four blades at the exact same position.

The information acquired during the inspection was then used to determine the correct measurements needed for the cropping. The area to be cropped was marked out on the four blades and verified. The team then cropped the blades one by one and ground their edges to give them the correct radius. When the cropping was complete, the Hydrex technicians polished the blades to make sure that any remaining loss of efficiency would be minimal.

This restored the propeller’s balance and brought its performance as close to its optimum performance as could be achieved. The job was completed on-site, saving the time, expense and extra work of drydocking the vessel.

[mappress] Subsea World News Staff , May 04, 2012; Image: Hydrex

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Shell, GTT, and Lloyd’s Register eye hybrid-electric LNG carrier design
  2. 2Equinor to feed Dutch grid with low-emission Norwegian gas through 2031
  3. 3BW Energy locks down multimillion-dollar financing for offshore platform and production growth
  4. 4Tidal energy array in Scotland cleared for construction start

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free