Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Norway: Toxic Gas Leak Shuts Statoil’s Statfjord C Platform
Fossil Energy

March 15, 2012 · about 14 years ago

Norway: Toxic Gas Leak Shuts Statoil’s Statfjord C Platform

A hydrogen sulphide alarm was reported to Statoil’s emergency centre at 10.39 today from the Statfjord C platform in the Tampen area of the North Sea. The position is now under control. The 236 people on the platform are all accounted for, and everyone except key personnel required to handle the inc

2 minutes read
  • LinkedIn
  • X
  • Email

A hydrogen sulphide alarm was reported to Statoil’s emergency centre at 10.39 today from the Statfjord C platform in the Tampen area of the North Sea. The position is now under control.

The 236 people on the platform are all accounted for, and everyone except key personnel required to handle the incident mustered to the lifeboats.

While the platform has been shut down, no personal injuries have been reported. The crew have now left the lifeboats.

Hydrogen sulphide is a toxic gas, and detectors are activated at low concentrations. These are now falling from the initial measurements, and no hydrocarbon leaks have been detected.

The official rescue service and the authorities have been notified about the position, and Statoil’s emergency response organisation is mobilised.

At this point, the most important job for the response team is to establish the overall picture and to mobilise the resources required for further handling of the position.

Statoil’s emergency response leadership deals with all incidents on the basis of a worst-case scenario, and then adjusts the action taken to the way they actually develop.

The weather in the area is good. Vessels and helicopters are available locally to provide support for the platform if required.

Statoil sets clear priorities for crises. Safeguarding the people involved comes first, then the environment, and finally the technical integrity of the installation and the group’s industrial interests.

Update

The leak point that triggered an H2S alarm in the utility shaft on Statfjord C has been identified as a flange to the wall against a storage cell. All mustered personnel on the platform is demobilized. Four people with breathing equipment have been sent down the shaft to investigate the leak. Local measurements is 8-10 ppm (parts per million).

All personnel have been permitted to call home. Alerted aditional emergency response resources, such as boats and helicopters, are now demobilized.

Statoil will investigate the cause of the leak, and make all necessary repairs that may follow.

Production at the platform remains shut down. It is only output from this platform that is affected. Statfjord C has a daily production rate of 25,000 barrels of oil equivalent.

[mappress] Source: Statoil, March 15, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Huge investment to keep first UK-France interconnector running until at least 2050
  2. 2First-of-its-kind marine robotics test and development center opens in Norway
  3. 3Shell ups its production ante with first oil from US Gulf project’s third chapter
  4. 4Germany’s SEFE firms up two-decade-long offtake deal with Canadian LNG project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free