Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Dragon Oil Successfully Starts Cheleken Drilling Program
Fossil Energy

January 13, 2012 · about 14 years ago

Dragon Oil Successfully Starts Cheleken Drilling Program

Dragon Oil plc, an international oil and gas exploration, development and production company, announces that the Dzheitune (Lam) 13/140A sidetrack was completed with a single string to a depth of 2,237 metres by Rig 40 and tested for initial production at 2,123 barrels of oil per day (“bopd”). This

2 minutes read
  • LinkedIn
  • X
  • Email

Dragon Oil plc, an international oil and gas exploration, development and production company, announces that the Dzheitune (Lam) 13/140A sidetrack was completed with a single string to a depth of 2,237 metres by Rig 40 and tested for initial production at 2,123 barrels of oil per day (“bopd”).

This shows the great potential of side tracking low producing wells in the future. Rig 40 has now returned to the Dzheitune Lam 13/163 well to make additional perforations in new intervals to improve the flow capacity of this well. The initial test rate from the Dzheitune (Lam) 13/163 well, achieved at deeper reservoir intervals in December 2011, was 296 bopd.

The Dzheitune (Lam) A/165 well was completed as a dual producer to a depth of 3,060 metres by the Iran Khazar rig. The short and long strings tested at the initial rate of 1,231 bopd and 1,041 bopd, respectively. The well tested for the combined initial production at 2,272 bopd.

The Iran Khazar rig has been mobilised to the Dzheitune (Lam) C platform and has spudded the Dzheitune (Lam) C/167 development well.

Dr Abdul Jaleel Al Khalifa, Chief Executive Officer, commented:

“I am extremely pleased to announce a successful start to the 2012 Cheleken drilling program. We have already completed and tested one development well and one sidetrack well, and drilling from the Dzheitune (Lam) C platform has commenced on schedule. We exited 2011 at the production rate of 71,751 bopd, ahead of our 70,000 bopd target, which was reached in mid-December. The good news reported today puts us in a strong position to continue to deliver solid results from the Cheleken Contract Area as we progress through the year.”

[mappress] Offshore Energy Today Staff, January 13, 2012; Image: Dragon Oil

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Seatrium rakes in millions with Keppel’s RigCo to revive four stranded rigs
  2. 2Rig incident: 110 rescued, 5 still missing after Borr Drilling’s jack-up sinks off Gabon coast
  3. 3Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  4. 4DOF opts to sell 2018-built subsea vessel as attractive offer emerges

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free