Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Green Marine›Russia: CF Receives New Project 705B Harbor Tug RB-10
Green Marine

November 15, 2011 · about 15 years ago

Russia: CF Receives New Project 705B Harbor Tug RB-10

In accordance with state rearmament program, Caspian Flotilla (CF) received new Project 705B harbor tug RB-10 developed by JSC Vympel Design Bureau (Nizhny Novgorod) and built by Astrakhan Shipyard, affiliate of JSC Zvezdochka Ship Repair Center. First tug of this project joined Caspian Flotilla in

2 minutes read
  • LinkedIn
  • X
  • Email

In accordance with state rearmament program, Caspian Flotilla (CF) received new Project 705B harbor tug RB-10 developed by JSC Vympel Design Bureau (Nizhny Novgorod) and built by Astrakhan Shipyard, affiliate of JSC Zvezdochka Ship Repair Center .

First tug of this project joined Caspian Flotilla in 2011.

RB-10 is not just another auxiliary ship received by the flotilla. This ‘river-sea’ class ship was specially designed with regard to specific nature of the Caspian Sea and estuary of the Volga River. The tug is fitted-out with newest equipment, up-to-date radio-navigation facilities, communication aids, and automatics.

Basic advantage of the ship is its improved navigability; thanks to her shallow draft (280 cm), RB-10 is capable to overcome shallow waters of the Volga River, Volga-Caspian Canal, and northern Caspian Sea. Two powerful (800 shp each) engines make her capable to tow any CF ship easily.

Harbor tug is designed for towage of vessels in littoral sea zones, bringing ships afloat, and mooring operations.

Basic characteristics of Project 705B harbor tug:

displacement – 310 tons engine power – 1,600 shp max speed – 12 knots range – 700 miles

Apart of the third tug of this project, Astrakhan branch of Zvezdochka shipyard had laid down and builds Project 22870 salvage ship for Caspian Flotilla.

Main purpose of Project 22870 ship is search works; fire extinguishing of damaged ships and coastal objects; evacuation and medical care of sufferers; power supply of damaged vessels and keeping them afloat; diving operations at depths down to 60 meters; surface oil pickup.

Basic characteristics of Project 22870 salvage ship:

displacement – about 1,200 tons draft – 3.2 meters speed – about 14 knots

Delivery and commissioning of both vessels into Caspian Flotilla is scheduled in 2012-2013.

[mappress] World Maritime News Staff, November 15, 2011; Image: sdelanounas

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Green MarineBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1New gas pay for Chevron in Mediterranean waters
  2. 2DeepOcean to employ recently upgraded subsea vessel offshore Ghana
  3. 3Saipem wins multimillion-dollar rig jobs with Eni in Mediterranean and West Africa
  4. 4Woodside passes the baton for offshore gas project to Timor Gap in $200 million deal

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free