Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Russia: PF to Hold Launching Ceremony of Hydrographic Ship Valery Faleyev
Subsea

November 10, 2011 · about 15 years ago

Russia: PF to Hold Launching Ceremony of Hydrographic Ship Valery Faleyev

Solemn launching ceremony of Pacific Fleet (PF) hydrographic ship Valery Faleyev will be held on Nov 12 in the Maly Uliss Bay, Vladivostok. The new ship is designed for oceanographic researches for Pacific Fleet, reports Russian defense ministry’s press service. The ship’s launching will coincide wi

1 minutes read
  • LinkedIn
  • X
  • Email

Solemn launching ceremony of Pacific Fleet (PF) hydrographic ship Valery Faleyev will be held on Nov 12 in the Maly Uliss Bay, Vladivostok. The new ship is designed for oceanographic researches for Pacific Fleet, reports Russian defense ministry’s press service.

The ship’s launching will coincide with 155th anniversary of PF Hydrographic Service.

There will be a meeting, the ship consecration by a representative of Russian Orthodox Church, briefing of shipyard’s officials and the fleet command, meetings with veterans of PF Hydrographic Service, and onboard excursion for press.

Project V19910 small-size hydrographic ship Valery Faleyev

Serial number 2001. Laid down on October 24, 2006. Built by JSC Vostochnaya Verf shipyard.

The project is adapted for shipbuilder’s capability; it is a modification of Project 19910 hydrographic ship Vaigach built in 2007.

Basic characteristics:

Full displacement – about 1,000 tons Dimensions: length overall – 56.4 meters; waterline length – 53.7 meters; beam overall – 11.2 meters; waterline beam – 11 meters; hull height – 5.4 meters; draft – 2.9 meters. Propulsion plant: 2 x 1,000 kW diesel generators, 1 x 160 kW diesel generator , 2 orbit-roll steerable propellers. Full speed – 12.5 knots Range – 2,000 miles Endurance – 15 days Crew – 17 men

[mappress] Source: Rus Navy, November 10, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Venture Global and ConocoPhillips play the long game with 20-year LNG pact
  2. 2Egypt and Chevron seal Mediterranean oil & gas exploration deal
  3. 3Subsea battery system for offshore wind completes test before deployment
  4. 4$125M purchase: New owner to take over 178-meter subsea vessel next October

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free