Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Norway: NPD Gives Nod to Rocksource for Drilling Near Norne Field
Fossil Energy

August 31, 2011 · about 15 years ago

Norway: NPD Gives Nod to Rocksource for Drilling Near Norne Field

The Norwegian Petroleum Directorate has granted Rocksource ASA a drilling permit for wellbore 6608/11-7 S, cf. Section 8 of the Resource Management Regulations. Well 6608/11-7 S will be drilled from the Borgland Dolphin drilling facility in position 66°14’01.32” north and 8°30’47.34” east after comp

1 minutes read
  • LinkedIn
  • X
  • Email

The Norwegian Petroleum Directorate has granted Rocksource ASA a drilling permit for wellbore 6608/11-7 S, cf. Section 8 of the Resource Management Regulations.

Well 6608/11-7 S will be drilled from the Borgland Dolphin drilling facility in position 66°14’01.32” north and 8°30’47.34” east after completing the drilling of wildcat well 6407/5-2 S for OMV Norge AS in production licence 471.

The drilling program for well 6608/11-7 S relates to the drilling of a wildcat well in production licence 559. Rocksource ASA is the operator with an ownership interest of 60 per cent. The other licensees are VNG Norge AS (30 per cent) and Skagen 44 AS (10 per cent).

The area in this licence consists of the blocks 6608/10 and 6608/11. The well will be drilled about six kilometres northeast of the ”Linerle” discovery and 32 kilometres northeast of the Norne field.

Production licence 559 was awarded in APA 2009. This is the first well to be drilled in the licence.

The permit is contingent upon the operator securing all permits and consents required by other authorities before commencing the drilling activity.

[mappress] Source:NPD, August 31, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Methanol-ready energy subsea construction vessel arrives in Norway for completion
  2. 2Equinor employs 2009-built Odfjell Drilling rig for additional wells
  3. 3Nexans starts manufacturing 525 kV subsea cables for LanWin2 offshore wind grid connection
  4. 4More oil found at permit offshore Gabon

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free