Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Eni Restarts Drilling at Gawain-1 Prospect Offshore Australia
Fossil Energy

April 11, 2011 · about 15 years ago

Eni Restarts Drilling at Gawain-1 Prospect Offshore Australia

Octanex N.L. has been advised by Eni Australia Limited, the Operator of the Gawain-1 well located in the outer Exmouth Plateau permit, WA-362-P, that at 06:00 hours WST (Western Standard Time) on Monday, 11 April 2011, the well was at a depth of 3,778m MDRT (measured depth below rotary table) and ru

1 minutes read
  • LinkedIn
  • X
  • Email

Octanex N.L. has been advised by Eni Australia Limited, the Operator of the Gawain-1 well located in the outer Exmouth Plateau permit, WA-362-P, that at 06:00 hours WST (Western Standard Time) on Monday, 11 April 2011, the well was at a depth of 3,778m MDRT (measured depth below rotary table) and running in to drill ahead in the 8V£” hole towards to the programmed total depth of 4,025m MDRT.

Since the last progress report of 4 April 2011, at which time the drillship had sailed away from the well location due to a developing tropical low, the drillship has returned to the well location and completed the operations necessary to re-commence drilling.

The next target for the well is a seismic amplitude anomaly within mapped closure at 3,832m MDRT. A positive outcome at the 3T832m MDRT target may lead to deepening the well.

The Gawain-1 well is being drilled by the Saipem 10000 drillship and is the first well in a two well programme. It will be immediately followed by the Galahad-1 well to be drilled in WA-363-P.

The participants in the WA-362-P and WA-363-P Joint Ventures are:

Eni Australia Limited 40%

OMV Australia Pty Ltd 40%

Octanex Group 20%

[mappress]

Source: Octanex, April 11, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rockhopper pledges $44 million for oil project’s second Falklands-bound FPSO
  2. 2Valaris rigs find more work in North Sea, Australia, and Suriname
  3. 3Coastal gridlock: California’s infrastructure ban and Gulf pushbacks trigger an energy tug-of-war
  4. 4Dutch design ultra-shallow-draft DSV for Gulf Region's oil & gas

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free