Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Norway: ConocoPhillips Selects Subsea 7 for Two SURF Contracts at Greater Ekofisk
Fossil Energy

April 8, 2011 · about 15 years ago

Norway: ConocoPhillips Selects Subsea 7 for Two SURF Contracts at Greater Ekofisk

Subsea 7 S.A. announced today the award of two SURF contracts with an approximate total value of $150 million from ConocoPhillips Skandinavia AS, on the Greater Ekofisk Area in the North Sea. The first contract is for the engineering, procurement, fabrication, installation and hyperbaric weld tie-in

1 minutes read
  • LinkedIn
  • X
  • Email

Subsea 7 S.A. announced today the award of two SURF contracts with an approximate total value of $150 million from ConocoPhillips Skandinavia AS, on the Greater Ekofisk Area in the North Sea.

The first contract is for the engineering, procurement, fabrication, installation and hyperbaric weld tie-in of a new water injection line. The new line will be connected with inline Tee structure to an existing 24” water injection pipeline on the Eldfisk Field. The scope also includes umbilical and Host Protection Structure installation. Engineering will commence in the second half of 2011, with offshore operations primarily in 2012.

The second contract is for the engineering, procurement, installation and tie-in of spools, associated structures and production covers for the 24” and 30” oil and gas export pipelines to the new 2/7S platform on the Ekofisk Field. The scope also includes the re-routing of the 14” Embla production line to the new platform. Engineering will commence in the second half of 2011, with offshore operations in 2012, 2013, 2014 and 2015.

[mappress]

Source:Subsea 7, April 8, 2011; Image:ConocoPhillips

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Shell to take a slice of Equinor's $10 billion oil project in Canada
  2. 2SLB and TotalEnergies enter into 15-year digital drilling agreement
  3. 3World’s first ammonia-powered dry bulk carrier ready for maiden voyage
  4. 4Weatherford expands its scope of work for Equinor

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free