Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›ODE Wins Contract for Two Gwynt y Môr Substation Platforms (UK)
Offshore Wind

April 5, 2011 · about 15 years ago

ODE Wins Contract for Two Gwynt y Môr Substation Platforms (UK)

International engineering contractor Offshore Design Engineering Ltd (ODE) has been awarded a new six-figure contract by Burntisland Fabricators (BiFab) to provide the engineering and design of two substation platforms for a wind farm off the North Wales coast. ODE will produce the detailed design o

1 minutes read
  • LinkedIn
  • X
  • Email

International engineering contractor Offshore Design Engineering Ltd (ODE) has been awarded a new six-figure contract by Burntisland Fabricators (BiFab) to provide the engineering and design of two substation platforms for a wind farm off the North Wales coast.

ODE will produce the detailed design of the jacket and primary steel design as well as the secondary and tertiary structure of the substations for NPower Renewables’ Gwynt y Môr offshore wind farm.

BiFab are responsible for the design, supply and fabrication of jacket foundations for the substation platforms.

ODE chairman and managing director, Peter Godfrey , said: “After the success of providing BiFab with detailed engineering and design of the Greater Gabbard wind farm transformer jackets and the Ormonde SSP substructure design, we are delighted to be working with our partners once again. We have already made a start on the basic engineering and are collaborating with the various third parties to ensure the design is optimised.”

Gwynt y Môr Offshore Wind Farm Limited was set up by Npower Renewables Limited and will develop a site 13km offshore from the North Wales coast stretching from Prestatyn to Colwyn Bay. The new wind farm will consist of 160, 3.6MW wind turbine generators with a gross output of 576MW.

[mappress]

Source:ode-ltd , April 05, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Venture Global and ConocoPhillips play the long game with 20-year LNG pact
  2. 2Egypt and Chevron seal Mediterranean oil & gas exploration deal
  3. 3Subsea battery system for offshore wind completes test before deployment
  4. 4$125M purchase: New owner to take over 178-meter subsea vessel next October

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free