Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Greece: Energean Oil & Gas Successfully Completes PA-35 Infill Well on Prinos Field
Fossil Energy

February 17, 2011 · about 15 years ago

Greece: Energean Oil & Gas Successfully Completes PA-35 Infill Well on Prinos Field

Energean Oil & Gas announces the successful completion, testing and placement on production of the PA-35 infill well on Prinos Field. Reaching a total depth of 2,975 meters, ahead of budget in terms of both time and cost, the well is the first of a series of drilling activities and other interventio

2 minutes read
  • LinkedIn
  • X
  • Email

Energean Oil & Gas announces the successful completion, testing and placement on production of the PA-35 infill well on Prinos Field. Reaching a total depth of 2,975 meters, ahead of budget in terms of both time and cost, the well is the first of a series of drilling activities and other interventions included in the “Prinos 5000” project.

The project aims to increase the daily production from the Prinos Development License to 5,000 boed within 2011.

The PA-35 was carried out by the recently modernized Jack-up Rig GSP Saturn and its primary objective was to produce oil from the B and C reservoirs into an undeveloped compartment of Prinos Field. The specific target area was selected on the basis of a detailed reservoir modeling built recently by the Company’s in-house team of Engineers and G&G experts.

The well has confirmed the presence of both the B and C reservoirs that were found in the area at the depths of 2,859 m MD and 2,909 m MD, respectively. Several oil-bearing intervals were indentified clearly during drilling these zones and by the subsequently acquired Geological and Petrophysical logs.

The acquired log data has also unraveled the presence of oil-bearing zones of the reservoirs, thus, increasing considerably the upside production potential of PA-35. These zones are now kept as future recompletion intervals that will be exploited following the establishment of the reservoir model for the A1 and A2 reservoirs that is currently in progress.

The PA-35 well was placed on production at a stabilized rate of 1,000 bopd bringing Energean’s daily production up to 3,000 boed. Moreover, the total reserves of the PA-35 are estimated to be 1.8Mmbb and the Company will proceed in more drilling activities to ensure the optimum development of the field. The next intervention on schedule will be the recompletion of the “Epsilon” well that has already been commenced as part of the “Prinos 5000” project.

Commenting on the results, Mr. Mathios Rigas, Chairman & Managing Director of Energean Oil & Gas , stated : “We are very pleased with the first results of our “Prinos 5000” program. The production of the first well has met our expectations, and will hopefully be a trend that continues as we complete the rest of our program to boost production and secure the sustainable growth of our Company.”

[mappress]

Source:Energean, February 17, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free