Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Peregrino STP buoy pull-in completed with First Subsea connector (Brazil)
Subsea

February 7, 2011 · about 15 years ago

Peregrino STP buoy pull-in completed with First Subsea connector (Brazil)

Maersk FPSO has completed the retrieval and pull-in of a submerged turret production (STP) buoy into the Maersk Peregrino FPSO, offshore Brazil, using a First Subsea ball and taper, buoy pull-in tool. Moored in 100m of water, in Peregrino field, Block BM-C-7, Campos Basin, Brazil, the STP buoy is he

1 minutes read
  • LinkedIn
  • X
  • Email

Maersk FPSO has completed the retrieval and pull-in of a submerged turret production (STP) buoy into the Maersk Peregrino FPSO, offshore Brazil, using a First Subsea ball and taper, buoy pull-in tool.

Moored in 100m of water, in Peregrino field, Block BM-C-7, Campos Basin, Brazil, the STP buoy is held in place with 10 mooring lines each attached to the side of the STP buoy using Ballgrab mooring line connectors. A male Ballgrab connector was also chosen to retrieve and pull the 600 tonne buoy into the Maersk Peregrino FPSO by integrating a female connector receptacle within the top of the buoy

Prior to the Maersk Peregrino FPSO arriving on-station, the male Type III Ballgrab (MBL 1,200 tonnes), attached to the pull-in rope, was lowered into the female connector on the STP buoy by the installation vessel Maersk Attender. Once the FPSO was in position the buoy, held 22m below the surface, was pulled into the vessel’s mating cone module. With the STP buoy locked in position, the Maersk Peregrino FPSO is permanently moored at its location.

The Ballgrab pull-in tool performed well, enabling the STP buoy to be lifted into position within the project schedule.

[mappress]

Source: firstsubsea,February 07, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies earmarks annual spend of up to $17 billion over next five years
  2. 2Fugro performs ultra-deepwater AUV survey off East Malaysia
  3. 3Southeast Asian oil field development clears key environmental hurdle to move toward FID
  4. 4‘Major’ oil & gas player awards Shearwater with three-year contract off South America

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free