Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›CB&I Awarded Feed Contract for Shtokman LNG Export Terminal Project (Russia)
Clean Fuel

November 16, 2010 · about 16 years ago

CB&I Awarded Feed Contract for Shtokman LNG Export Terminal Project (Russia)

CB&I announced today that CB&I Lummus has been awarded a contract for the front-end engineering & design (FEED) services for the Shtokman LNG storage and loading facility at the sea port in Terriberka in the Murmansk region of the Russian Federation. The sea port is part of the Shtokman Gas-Condensa

1 minutes read
  • LinkedIn
  • X
  • Email

CB&I announced today that CB&I Lummus has been awarded a contract for the front-end engineering & design (FEED) services for the Shtokman LNG storage and loading facility at the sea port in Terriberka in the Murmansk region of the Russian Federation.

The sea port is part of the Shtokman Gas-Condensate Field Development Project developed by Gazprom Dobycha Shelf LLC, a fully owned subsidiary of Gazprom JSC. CB&I’s contract, which is scheduled for completion in 2011, has been awarded by Giprospetsgas JSC, the project general designer.

The value of the contract was not disclosed. The Shtokman Gas-Condensate Field Development Project consists of the production, treatment, transportation, liquefaction, storage and shipping of natural gas and natural gas liquids from the Shtokman field located 600 km offshore in the Barents Sea, north of Kola Peninsula, Russia.

The field has an estimated 3.9 trillion cubic meters of natural gas reserves. CB&I’s project scope includes concept and FEED development of the LNG storage and loading facility, including multiple 160,000 cubic meter full containment LNG storage tanks and the associated process piping and loading facilities.

Concept and FEED development will provide the project schedule and cost estimates for the engineering, procurement and construction phase. CB&I will also prepare the Russian design dossier (Proyekt) in accordance with regulatory requirements.

[mappress]

Source: CB&I , November 17, 2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Connecting the offshore energy industry through smarter travel
  2. 2Borr Drilling’s rig trio lines up jobs in Africa and Europe
  3. 3Inpex broadens its Southeast Asian horizons with two offshore blocks
  4. 4Dutch LNG terminal capacity rises to 20 billion cubic meters with 4th tank

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free