Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Gabon: Vaalco Energy Moves Sapphire Driller to Drill Etame 7H Well
Fossil Energy

August 4, 2010 · about 16 years ago

Gabon: Vaalco Energy Moves Sapphire Driller to Drill Etame 7H Well

VAALCO Energy, Inc. today provided a further update on the Southeast Etame No. 1 (“ETSEM-1”) exploration well which, as previously announced, was drilled to a total depth of 2,757 meters (9,045 feet) offshore Gabon encountering approximately five meters (sixteen feet) of Gamba sandstone section whic

2 minutes read
  • LinkedIn
  • X
  • Email

VAALCO Energy, Inc. today provided a further update on the Southeast Etame No. 1 (“ETSEM-1”) exploration well which, as previously announced, was drilled to a total depth of 2,757 meters (9,045 feet) offshore Gabon encountering approximately five meters (sixteen feet) of Gamba sandstone section which logged oil full to base.

VAALCO has completed a second sidetrack of the well and preliminary information indicates an oil column of up to 27 meters (90 feet) based upon the estimated oil/water contact. Further analysis will be required to estimate the size of the discovery and to assess potential development strategies.

The drilling rig “Sapphire Driller” will move to the Etame field to commence drilling a new horizontal development well, Etame 7H (ET-7H). The well is designed to replace the original vertical field discovery well (ET-1V) and is expected to be completed in the fourth quarter of 2010.

As previously announced, the partners in the Etame Marin concession met in mid-July, 2010, and elected to drill two additional wells immediately following the four well program. The first well, ETBSM-2H, will be a development well in the South Tchibala field. The second well, ETOMG-1, will be a new exploration well to test both the Gamba and Dentale reservoirs in the Omangou prospect. The prospect is located approximately two miles southeast of the Ebouri platform and approximately four miles to the northwest of the center of the Etame field.

The Company’s subsidiary VAALCO Gabon Etame, Inc. operates the Etame Marin Permit in which it holds a 28.07% net interest in the Etame Field. Other participants in the permit are Addax Petroleum Etame Inc. (31.36%), Sasol Petroleum Etame Limited (27.75%), Sojitz Etame Limited (2.98%), PetroEnergy Resources Corp. (2.34%) and Tullow Oil Gabon SA (7.5%).

About VAALCO

VAALCO Energy, Inc. is a Houston, Texas based independent energy company principally engaged in the acquisition, exploration, development and production of crude oil. VAALCO’s strategy is to increase reserves and production through the exploration and exploitation of oil and natural gas properties with high emphasis on international opportunities. The Company’s properties and exploration acreage are located primarily in Gabon and Angola, West Africa.

[mappress]

Source: Valco Energy, August 4, 2010:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Connecting the offshore energy industry through smarter travel
  2. 2Borr Drilling’s rig trio lines up jobs in Africa and Europe
  3. 3Inpex broadens its Southeast Asian horizons with two offshore blocks
  4. 4Dutch LNG terminal capacity rises to 20 billion cubic meters with 4th tank

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free