Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›USACE Seeks Bidders for Craney Island Maintenance Dredging (USA)
Dredging

July 28, 2010 · about 16 years ago

USACE Seeks Bidders for Craney Island Maintenance Dredging (USA)

U.S. Army Corps of Engineers announces a Firm Fixed-price contract for the maintenance dredging of the Rehandling Basin at Craney Island Dredged Material Management Area (CIDMMA) to a depth of 30 feet with 2 feet of allowable overdepth. In addition, the work consists of maintenance dredging portions

1 minutes read
  • LinkedIn
  • X
  • Email

U.S. Army Corps of Engineers announces a Firm Fixed-price contract for the maintenance dredging of the Rehandling Basin at Craney Island Dredged Material Management Area (CIDMMA) to a depth of 30 feet with 2 feet of allowable overdepth. In addition, the work consists of maintenance dredging portions of the Access Channel(s) to a depth of 18 feet with 2 feet of allowable overdepth.

The work shall be performed by a hydraulic cutterhead dredge and pipeline, with all dredged material transported and placed in the Government-furnished upland placement area at Craney Island Dredged Material Management Area.

The Rehandling Basin dredging, including allowable overdepth dredging and estimated accretion, involves dredging approximately 1,000,500 cubic yards of material. The Access Channel dredging, including allowable overdepth dredging and estimated accretion, involves dredging approximately 7,300 cubic yards of material. Total estimated amount to be dredged is 1,007,800 cubic yards. The magnitude of the project is between $5,000,000.00 and 10,000,000.00.

The receipt date for bids is August 26, 2010 by 2:00 pm.

( fbo.gov )

[mappress]

Source: fbo.gov, July 29, 2010

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Connecting the offshore energy industry through smarter travel
  2. 2Borr Drilling’s rig trio lines up jobs in Africa and Europe
  3. 3Inpex broadens its Southeast Asian horizons with two offshore blocks
  4. 4Dutch LNG terminal capacity rises to 20 billion cubic meters with 4th tank

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free