Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Norway’s First Floating Rig Wired from Shore – GJOEA
Fossil Energy

July 15, 2010 · about 16 years ago

Norway’s First Floating Rig Wired from Shore – GJOEA

On Sunday 11 July Statoil switched on the power, making Gjøa Norway’s first floating platform to get electricity from the mainland. “This is a good example of how Statoil can play a part in solving some of the climate challenges in collaboration with the supplies industry,” says Bjørn Midttun, head

2 minutes read
  • LinkedIn
  • X
  • Email

On Sunday 11 July Statoil switched on the power, making Gjøa Norway’s first floating platform to get electricity from the mainland.

“This is a good example of how Statoil can play a part in solving some of the climate challenges in collaboration with the supplies industry,” says Bjørn Midttun, head of subsea installations, pipelines and marine operations on the Gjøa field.

Statoil had considered supplying the platform with electricity from the mainland, right from the start of the Gjøa project. And the world’s longest alternating current cable to be installed in one piece and with such high voltage is now a reality.

The electricity comes from Statoil’s Mongstad facility, north of Bergen, which provides very good security of supply for Gjøa.

Protecting the environment from CO2 emissions

Present calculations show that Statoil will avoid 210,000 tonnes of carbon dioxide (CO2) emissions per year by providing the Gjøa platform with power from shore. This is the equivalent of the annual emissions by about 100.000 cars. The alternative would have been a traditional solution using gas turbines on the platform as electricity generators.

Statoil and the contractor ABB have worked together for several years to develop a technology which makes it possible to replace the gas turbines on board a floating platform with a power cable from land.

New technology

The platform will require a maximum of 40 megawatts of electricity from land. The 90,000-volt cable is 100 kilometres long. It comprises a static and a flexible part. Running between the seabed and the floating platform, the flexible part of the cable has been the biggest challenge. The necessary technology did not exist before and had to be developed through the Gjøa project.

“Developing and adopting new technology is our most important measure for reducing the environmental impact of our operations,” notes Midttun.

Statoil has been the operator for Gjøa in the development phase. In the fourth quarter of 2010 GdF Suez takes over the production phase as its first operatorship for a field on the Norwegian continental shelf (NCS).

[mappress]

Source: Statoil, July 15, 2010:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Vår Energi bolsters its oil & gas portfolio with wrap-up of Pandion buy
  2. 2LNG-to-FSRU conversion widening Karpowership-backed Kinetics’ gas infrastructure fleet
  3. 3Potential for tidal lagoon in South East Wales being explored
  4. 4After Fugro, TDI-Brooks selected for surveys offshore Timor-Leste

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free