Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Fred. Olsen Windcarrier placed order with Lamprell Energy for two self elevating vessels
Offshore Wind

March 11, 2010 · about 16 years ago

Fred. Olsen Windcarrier placed order with Lamprell Energy for two self elevating vessels

Fred. Olsen Windcarrier announced today it has placed an order with the Lamprell Energy Ltd. shipyard in Dubai for two self elevating vessels for installation of offshore wind turbines.

2 minutes read
  • LinkedIn
  • X
  • Email

The vessels are enhanced GustoMSC 9000C designs, meaning self elevating vessels with four jackup legs and a large installation crane. The design incorporates important features from inhouse experience from offshore wind installation and maintenance work, as well as 160 years of maritime history. The governing thought throughout the vessel design phase has been to make the vessels as operable and flexible as possible, to perform the required tasks for loading, transporting and erecting wind turbine equipment offshore. Open deck space and accessibility achieved e.g. by the crane wrapping around one of the legs, plus the operability of a high performance jacking systems designed for fast and frequent jacking operations as required by the wind industry, are vital key words in this respect.

Says Tor Erik Andreassen, Managing Director of Fred. Olsen Windcarrier: ”We are confident that the vessels and their optimized design will contribute to a considerably more efficient installation process for offshore wind turbines. The technical solutions custom designed for the wind industry, providing a wider weather window, will extend the operability, greatly reduce installation time, limit the need for many other vessels and hence reduce overall installation costs. Adding to the vessel efficiency, they will be manned with a versatile multifunctional crew, also drawing on experienced wind installation teams from our daughter company Global Wind Services.”

The vessels shall be delivered in May and September 2012 and the contract with the yard includes options for two additional vessels.

Source: windcarrier, 11 March, 2010, Press release

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field
  2. 2TotalEnergies’ Caspian Sea gas and condensate field expansion is a go
  3. 3TotalEnergies earmarks annual spend of up to $17 billion over next five years
  4. 4Fugro performs ultra-deepwater AUV survey off East Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free